PLAYBOOK / 10 MIN READ

How to move an AI pilot to production.

By Alex Cinovoj, Founder & CTO, TechTide AI · CTO & Co-Founder, CPG Playbook

I would review the pilot, address its foundation, then evaluate one workflow before expanding scope. The sequence below is an illustrative planning outline, not a delivery deadline or a measured client result. The release decision depends on the actual dependencies, acceptance tests, permissions, and recovery evidence.

Step 1: Score the pilot honestly

Before any code, answer five questions in writing:

  1. What's the one workflow we'd ship first if we had to pick one this week?
  2. What does "ready" look like for that workflow? (Eval pass rate, cost ceiling, latency SLO, rollback path.)
  3. What's the worst thing this system can do to a real user or to our data, and what stops it?
  4. What gets cut from scope to hit the date?
  5. Who owns the runbook after release?

If the team can't answer all five, the pilot isn't stuck on Claude. It's stuck on definition. Fix that before writing code.

Step 2: Build the eval suite first

Twenty to fifty regression cases representing the workflow's actual job. Inputs that look like real production traffic. Outputs scored against a deterministic rubric or a judge model with a held-out gold set. Eval suite goes into CI, runs weekly, blocks deploys on regression. If your team can't write the cases, the workflow isn't defined yet. This is the single highest-leverage step.

Step 3: Harden the foundation before the model

  • Scoped MCP tools. Typed inputs, typed outputs, scoped OAuth, kill switch. Write tools route through a reviewer queue.
  • Auth boundary in code. The model never holds raw credentials. Your server enforces row-level security.
  • Output validation. Structured outputs validated against a schema. Failures retry with a corrective prompt, then fail closed.
  • Token guardrails. Per-session and per-day caps, fallback to a cheaper model on context overflow.
  • Observability. Every call logged with prompt, response, user, timestamp, latency, cost. Piped to your existing stack.

Step 4: Ship one workflow, not five

Evaluate one workflow against its acceptance criteria before expanding scope. A staged rollout might use 5%, 25%, then 100%, with progression based on observed behavior and cost limits. Choose stages that fit the actual workload, keep the runbook available, and verify the receiving team can operate the release.

Step 5: Run the second workflow on the same chassis

Before adding a second workflow, review which monitoring, access controls, and evaluation infrastructure can be reused. Test the new workflow's own requirements and failure paths. Reuse may reduce duplicated work, but this outline does not establish a delivery-time reduction.

When to ask for outside help

When the team has missed the original launch date by 30+ days, when scope keeps growing instead of shrinking, when the engineers can't agree on "ready", that is the signal. If this is what is holding your product back, send the project brief. I look at what exists, keep what works, and agree the journey that has to work before any build starts.

Frequently asked

  • Timing depends on scope, existing code, dependencies, permissions and acceptance evidence. This outline is illustrative and does not establish a three-week delivery commitment.