Define one business outcome
Choose a narrow outcome with a named owner. “Improve operations with AI” leaves too much room for a successful demo that changes nothing. “Prepare a source-linked draft record for a reviewer” gives the team a concrete output to inspect.
Specify where the workflow begins and ends. Does it begin when an email arrives, when an approved form is submitted, or when an operator starts a job? Does it end at a draft, an approved record, or a verified update in another system?
Write the exclusions beside the outcome. If external sending, payment, or deletion is outside the pilot, say so. Those boundaries should be enforced in the available tools and permissions, not left as a paragraph in the project document.
The acceptance owner should be someone who understands the operational result. Engineering can establish that the code ran; the process owner needs to establish that the output is usable.